The structure includes twenty-four stories above grade and two below grade parking levels.  The structure consists primarily of post-tensioned and reinforced cast-in-place concrete over a standard mat foundation.  Other portions of the project include the construction of a retaining wall supported by auger cast piles as well as a timber pile supported walkway located adjacent to the proposed storm water management pond.  

 

 

Specialized Engineering’s Role

 Specialized Engineering provided geotechnical investigation, environmental, and construction materials testing services for the project. 

  • Environmental consulting

  • Feasibility studies

  • Geotechnical evaluation

  • Soil compaction

  • Timber/auger cast pile inspections

  • Foundation inspections

  • Post tension, reinforcing steel & formwork inspections

  • Cast-in-place concrete

  • Spray-applied fireproofing

  • Firestopping

  • Asphalt placement testing and inspections

  • Mortar sampling testing & masonry inspections

  • Structural Steel

  • Light Gauge framing 

  • Pre-cast concrete inspections

  • Waterproofing inspections

  • EIFS inspections

  • Substrate preparation inspections

  • Sheathing penetrations

  • Water resistive barrier 

  • Masonry veneer envelope inspections

  • Air Barrier 

  • Storefront/window assembly

  • Roof inspections

  • Laboratory Testing (standard/modified proctors, soil classifications, compressive strength of concrete cylinders, mortar cube, grout & masonry prisms, concrete mix verification)