Taxiway T2 Construction - BWI Airport

This project consists of the construction of a new aircraft taxiway at BWI Marshall Airport. The work under this contract includes bituminous concrete pavement demolition, excavation, storm drain pipe and inlet removal, new Portland cement concrete pavement, new bituminous concrete pavement, new shoulder pavement, mill and overlay existing asphalt pavement, storm drain pipe installation, storm drain inlet and manhole installation.

 

 

Specialized Engineering’s Role

  • Foundation soil bearing

  • Sub-grade proof-rolling observations

  • Utility backfill

  • Structural fill

  • Soil compaction

  • Cast-in-place concrete

  • Asphalt compaction

  • Asphalt plant inspections and testing

  • Soil/aggregate field testing/inspections

  • Molding of concrete beam specimens

  • Laboratory Testing (standard/modified proctors, sieve analysis, Atterberg limits, compressive strength of concrete cylinders, HMA maximum theoretical density, bulk specific gravity, box samples)

bwi_airport-500.0.jpg
Previous
Previous

Hold Bar 4 - Reagan National Airport