| Pentagon Wedge I - Arlington, Virginia | ||||||||||
| Demolition of existing basement structure, excavation to lower basement floor and installation of new piles to support future building loads, installation of new mezzanine level. | ||||||||||
| Scope of Services: Furnished construction inspection and laboratory testing of materials, including: | Type of construction: Cast-in-place Reinforced Concrete
Total Project Cost: $30,000,000
Duration of Construction: 1998-1999
|
|||||||||
of piles during load testing using Davison Offset Method, perform vibration monitoring during pile driving, prepare pile pay perform laboratory field density inspection of reinforcing steel laboratory testing of concrete test cylinders |
||||||||||
![]() |
||||||||||